argunix
☰

packages.x86_64-linux.test-overlay

← eval #148

system
x86_64-linux
status
failure
started
2026-09-18 09:09:11 UTC
finished
2026-09-18 09:09:39 UTC
total
28s
derivation
/nix/store/15jiszzy40xny9g1iqhgz37dkbznaxiy-container-test-run-Test-with-overlays.drv

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 4s 20.83 MB
build (net, on builder) 23s —
pull (output closure ← builder) — —

view build log